Consolidated Contracting Engineering & Procurement S.A.L. Offshore – Abu Dhabi (CCC) / AL HOSN GAS
Shah, Abu Dhabi, United Arab Emirates
SHAH SULPHUR STATION AND PIPELINES PROJECT SITE PREPARATION / EARTHWORKS
CH2MHILL / VECO Engineering
Mass Earthworks for the erection of the Shah Sulphur Station and Pipelines.
The scope of work consists of approximately 5.6 million cubic meters of cut/excavation to fill and approximately 17.5 million cubic meters of cut/excavation to dispose.
Limitless LLC
Jebel Ali, Dubai, United Arab Emirates
The Arabian Canal Development - Phase 1
The Project involves creating a 75km man-made waterway, which will flow inland from Dubai Waterfront, passing to the east of the new Dubai World Central International Airport before turning back towards Palm Jumeirah. Up to 150 metres wide and six metres deep, it will be able to accommodate boats up to 40 metres long.
Mass Excavation of 207 million cubic meters & Fill of 207 million cubic meters up to depth of (-6) meters DMD/sea level in 3 years.
Satellite images are courtesy of Google Earth.
Dubai Aviation Engineering Projects (DAEP)
Jebel Ali, Dubai, United Arab Emirates
Phases I, II, III, IV, and V Site Grading Works
At the heart of Dubai World Central is the Al Maktoum International Airport. Built for the future, the airport once completed will have the capacity to handle 12 million tonnes of annual cargo capacity and 120 million passengers.
Mass excavation of a total of 62.5 million cubic meters & Fill of 64.5 million cubic meters in separate contracts of 1 year duration each.
Satellite images are courtesy of Google Earth.

Abu Dhabi General Services Company PJSC - Trading as MUSANADA
Shamkha, Abu Dhabi, United Arab Emirates
The Development of South Shamkha Infrastructure Earthworks Lot-1 & Lot-3
South Shamkha Development is an area situated approximately 12 km west of Abu Dhabi International Airport, and it comprises some 3,980 ha of previously undeveloped land allocated for the construction of 12,460 villas for UAE citizens, along with a central business district and various community facilities.
Mass excavation of a total of 22 million cubic meters & Fill of 8.4 million cubic meters in separate concurrent contracts of 1 year duration.
DAEWOO E&C / TAKREER
Mussafah, Abu Dhabi, United Arab Emirates
Inter Refinery Pipeline II (IRP-II) Mussafah Terminal Package – Site Grading Works (Fuel Farm)
Engineered fill for 24 fuel tanks foundations. Hauling of imported fill material from approved borrow areas, mixing to achieve specified engineered fill materials,filling and compaction of engineered fill materials.
Hauling of imported fill material from approved borrow areas, mixing to achieve specified engineered fill materials, filling and compaction of the engineered fill materials.
Satellite images are courtesy of Google Earth.